Happenings in Chin Tech

Basler Camera Setup Tutorial for Machine Vision Inspection: Lenses, Lighting, Triggering, and Calibration
Posted 2 days ago
How to Evaluate an Automation Company in Penang: Capabilities, Certifications, and Site Support That Matter
Posted 2 days ago
Robotic Soldering Machine Integration Tutorial: From Flux Control to Tip Maintenance and Quality Verification
Posted 4 days ago
Cobot Manufacturers: Key Differences in Safety, Programming, Payload, and Service Support for Malaysian Factories
Posted 4 days ago

Robotic Automation Malaysia Trends 2026: Cobots, AMRs, Machine Vision, and AI Inspection in Local Manufacturing
Posted 5 days ago
Automation System Integrator Malaysia Tutorial: URS, FAT/SAT, Cycle Time Validation, and Handover Documentation
Posted 6 days ago

Collaborative Robot Gripper Selection for High-Mix Production: Electric vs Vacuum vs Custom End-Effectors
Posted 1 week ago

SICK Sensor Malaysia: How to Specify Photoelectric, Safety, and Distance Sensors for Automation Projects
Posted 1 week ago
Vacuum Gripper Robot vs Mechanical Gripper: When Suction Wins (and When It Fails) in Real Production
Posted 1 week ago
Techman Robot in Malaysia: What Manufacturers Should Know Before Choosing a TM Cobot Integrator
Posted 1 week ago







